Medical Equipment Technical Requirements &
Utility Consumption Report
Project: CSSD Renovation
Date: November 2025
| Parameter | Sterilizer 1 (Small) | Sterilizer 2 (Large) | Washer Disinfector | Strict Requirement (Line Sizing) |
|---|---|---|---|---|
| Cold / Feed Water Supply | ||||
| Pressure | 3 - 5 bar | 3 - 5 bar | 2 - 8 bar | 3 - 5 bar (Regulated) |
| Flow Rate (Capacity) | 0.9 m³/h | 0.9 m³/h | ≥ 15 L/min (0.9 m³/h) | ≥ 0.9 m³/h per machine |
| Consumption (Avg) | ~0.09 m³/h | ~0.13 m³/h | Varies by cycle | Max 0.13 m³/h load |
| Hardness / Temp | 1-13 °d / <15°C | 1-13 °d / <15°C | 0-30 °dH / 5-30°C | 1-13 °dH @ <15°C |
| Demineralized / RO Water | ||||
| Flow Rate (Capacity) | 0.05 m³/h | 0.25 m³/h | (Implied by pressure) | ≥ 0.25 m³/h per machine |
| Conductivity | < 15 µS/cm | < 15 µS/cm | 3 - 200 µS/cm | < 15 µS/cm (Target <10) |
| Electrical & Environmental | ||||
| Power Supply | 400V 3NPE, 50Hz | 400V 3NPE, 50Hz | 400V 3NPE | 400V 3NPE ±10% |
| Connected Load | 17 kW (25A Fuse) | 24.5 kW (36A Fuse) | (Refer to Manual) | Min 36A / 25kW Supply |
| Heat Emission | 2.83 kW | 3.63 kW | ~1.5 kW | HVAC Load ~3.63 kW |
| Cooling Water (Opt.) | 0.8 m³/h Flow | 1.2 m³/h Flow | N/A | Line: 1.2 m³/h (if used) |