1. Electrical Inspection / Elektrische PrΓΌfung

According to EN 60204-1, EN 62353

1.1 Visual & Mechanical Checks

CheckStatusRemark
1.1 Blind plugs + cabinet key presentβœ“ OK
1.2 Covers for main terminals presentβœ“ OK
1.3 Cabinet labelled with lightning arrowβœ“ OK
1.4 Type plate presentβœ“ OK
1.5 Wire colours according to wiring diagramβœ“ OK
1.6 IP rating maintainedβœ“ OK
1.7 Cover / insulation of live partsβœ“ OK
1.8 Cover & marking of mains terminalsβœ“ OK
1.9 Separation of N and PE terminalsβœ“ OK
1.10 Cable & fuse sizing per wiring diagramβœ“ OK
1.11 PE sticker at protective conductor terminalsβœ“ OK
1.12 Earthing of control circuitsβœ“ OK
1.13 Earthing of cabinet, door, frameβœ“ OK
1.14 Sticker "Screw contacts tightened" presentβœ“ OK
1.15 Screw contacts tightenedβœ“ OK
1.16 Functional test of fuses / motor protectorsβœ“ OKMotor protector: 1gch SLP

1.2 Electrical Measurements

MeasurementTargetToleranceActual
1.20 Protective conductor continuity< 0.3 Ξ©β€”0.060 Ξ©
1.21 Insulation resistance> 2 MΞ©β€”> 3.10 MΞ©
1.22 Equipment leakage current< 5 mAβ€”0.028 mA
1.24 Residual voltage protection1s < 60Vβ€”9 V

1b. Electrical Inspection (Hot Sanitization Cabinet)

According to EN 60204-1, EN 62353 – Additional checks for hot sanitization

CheckStatus
1.1 Blind plugs + cabinet keyβœ“ OK
1.2 Covers for main terminalsβœ“ OK
1.3 Lightning arrow markingβœ“ OK
1.4 Type plateβœ“ OK
1.5 Wire colours per diagramβœ“ OK
1.6 IP ratingβœ“ OK
1.7 Cover/insulation of live partsβœ“ OK
1.8 Cover & marking mains terminalsβœ“ OK
1.9 Separation N / PEβœ“ OK
1.10 Cable/fuse sizing per diagramβœ“ OK
1.11 PE stickersβœ“ OK
1.12 Earthing control circuitsβœ“ OK
1.13 Earthing cabinet/door/frameβœ“ OK
1.24 Functional test of fusesβœ“ OK

Measurements (Hot Sanitization)

MeasurementTargetToleranceActual
1.20 Protective conductor continuity< 0.3 Ξ©β€”0.085 Ξ©
1.21 Insulation resistance> 2 MΞ©β€”134 MΞ©
1.22 Equipment leakage current< 5 mAβ€”0.0002 mA
1.24 Residual voltage1s < 60Vβ€”9 V

2. Parameterization / Functional Check (Components)

CheckStatus
2.1 Motor protector setting per wiring diagramβœ“ OK
2.2 Jumper settings Diatron 5500βœ“ OK
2.4 Parameter settings Diatron 5500 per parameter listβœ“ OK
2.5 SD card inserted and formattedβœ“ OK
2.6 Remote monitoring PC parameterization per checklistβœ“ OK
2.7 Visualization parameterization per checklistβœ“ OK
2.8 Teamviewer ID entered in circuit diagramβœ“ OK

3. Functional Test – Safety Relevant Devices

CheckStatus
3.1 LF and temperature measurements calibrated/checkedβœ“ OK
3.3 Sensor fault simulation Q02 / T02βœ“ OK
3.4 Sensor fault simulation Q03 / T03βœ“ OK
3.5 Watchdog simulationβœ“ OK
3.8 W2 shutdown triggerβœ“ OK
3.15 Empty alarm simulation (transfer tank)βœ“ OK
3.16 Hard water alarm simulationβœ“ OK
3.17 Position error simulation G02, G03 (normal mode)βœ“ OK
3.18 Moisture detector simulationβœ“ OK
3.19 Ring line leakageβœ“ OK
3.20 Heater – temperature sensor assignmentβœ“ OK
3.21 Subloop check (if present)βœ“ OK
3.22 Universal digital I/O checkβœ“ OK
3.23 Measure all heater currents during hot sanitizationβœ“ OK
3.24 Check 230VAC at all power terminals of additional/intermediate heaters during hot sanitizationβœ“ OK

4. Hydraulic Adjustments

CheckTargetToleranceActual
4.1 Setting DV026.5 barΒ±0.26.6
4.2 Setting DV01 (permeate basic setting without reduction)1.5 bar+1.02.4
4.4 Feed water quantity transfer tank (orifice at feed inlet after V01)1600 l/h @ 2 bar+200 / +0.51600 l/h / 2.5 l/s
4.5 Concentrate control valve stage 1 (V17) normal mode50% of 6.7Β±10%200 l/h
4.6 Concentrate control valve stage 2 (V15) normal mode50% of 6.15Β±10%-120 l/h
4.7 Pressure maintenance in ring line (Pr04) at system stop0.2 bar+1.00.64
4.8 Setting DV03 (concentrate amount constant regardless of V09 state)per 6.7Β±10%380 / 400

5. Functional Sequence Tests

CheckStatus
5.1 Normal mode manual/automaticβœ“ OK
5.2 Temperature rejection V09βœ“ OK
5.3 LF-dependent concentrate rejection via V09βœ“ OK
5.4 Temperature rejection V03βœ“ OK
5.5 Winter modeβ€”
5.6 Emergency mode level 1βœ“ OK
5.7 Emergency mode level 2βœ“ OK
5.8 Emergency control modeβœ“ OK
5.10 Hot sanitization: ring + devicesβœ“ OK
5.11 USB interface function: protocol saved to USB stickβœ“ OK

6. Hydraulic Test – Stage 1 & Stage 2

Stage 1

MeasurementTargetToleranceActual
6.1 Inlet pressure> 2.0 barβ€”3.5
6.2 Raw water temperature10–35 Β°Cβ€”11.3
6.3 Raw water conductivity100–1600 Β΅S/cmβ€”36.1
6.4 Conductivity transfer tank (concentrated) Q011600–2000 Β΅S/cmper test1500
6.5.1 Operating pressure (1PR05)max 22 barβ€”11.8
6.6 Concentrate pressure (PR06)max 22 barβ€”10.2
6.7 Concentrate flow (FL03)390 l/hΒ±10%350
6.8 Permeate flow (FL04)1180 l/hΒ±10%1180
6.9 Permeate conductivity (Q02)3% of 6.4β€”13.5 Β΅S/cm
6.10 Permeate temperature (T02)10–35 Β°Cβ€”24.5
6.15 Return pressure ring line (1Pr04)1.5–2 bar+1.0 bar32.4

Stage 2

MeasurementTargetToleranceActual
6.11 Supply pressure (PR07)> 2.0 barβ€”3.2
6.12.1 Operating pressure (PR08)max 16 barβ€”10.4
6.12.2 Operating pressure (PR08) at HR< 3 barβ€”β€”
6.13 Concentrate pressure (PR09)max 16 barβ€”9.0
6.14 Permeate back pressure (PR10)4 barΒ±10%4.1
6.15 Concentrate flow (FL05) normal/emergency180 / 330Β±10%190
6.16 Permeate flow (FL01) normal/emergency1000 l/hΒ±10%995
6.17 Permeate conductivity (Q03)1.5% of 6.4β€”11.5 Β΅S/cm
6.18 Permeate temperature (T03)10–35 Β°Cβ€”25.2

7. General Checks

CheckStatus
7.1 Process engineering check per R+1 schemeβœ“ OK
7.2 Flow sensors checked for correct nominal sizeβœ“ OK
7.3 Labeling per P&ID + plate replacement + positionsβœ“ OK
7.4 Correctness of labeling languageβœ“ OK
7.5 Copy of test protocol, parameter list, wiring diagram in cabinetβœ“ OK
7.6 Cable labeling presentβœ“ OK
7.7 Parameter backup and test protocol savedβœ“ OK
7.8 Distance between inductive sensor G02/G03 and ball valve < 1mmβœ“ OK
7.9 Analog output check per wiring diagramβ€”
7.7 (dup) Pump rotation directionβœ“ OK
7.8 (dup) Component tightnessβœ“ OK
7.11 "Caution Hot" sticker on ring inlet, after cover installationβœ“ OK
7.12 Extra undrilled blank loose on inlet with plastic bagβœ“ OK
7.13 Thermal image of heater contactors taken (during HR)βœ“ OK
7.14 Ferrites installed on controllerβœ“ OK
7.15 Measuring cell Q01 serial number02822 89 70102 03 800 49

Parameter Settings (Excerpt)

Temperature / Conductivity Limits

ParameterDescriptionSetpoint
P055T02 fault Β°C35
P062Q02 < range Β΅S/cm1
P063Q02 warning Β΅S/cm35
P064Q02 fault Β΅S/cm40
P072T03 < range Β°C2
P073T03 V09 to drain Β°C25
P074T03 warning Β°C30
P075T03 fault Β°C35
P082Q03 < range Β΅S/cm1
P083Q03 warning Β΅S/cm25
P084Q03 fault Β΅S/cm30
P092T04 < range Β°C2
P093T04 end heat up Β°C85 (80)
P094T04 limit max Β°C95
P095T04 > range Β°C99.9
P100–P104W2/T05 limitsrange 0–100, off 90, hyst. 2
P110–P114W3/T06 limitsrange 0–100, off 90, hyst. 2
P120–P124W4/T07 limitsrange 0–100, off 90, hyst. 2
P130–P134W5/T08 limitsrange 0–100, off 90, hyst. 2
P140–P144W6/T09 limitsrange 0–100, off 90, hyst. 2
P150–P154W1/T11 limitsrange 0–100, off 90, hyst. 2
P160–P163W12/T12 limitsrange 0–100, off 90

Timers / Disinfection

ParameterDescriptionSetpoint
HS116Standby after HS30 min
D010t-recirculation30 min
D011t-residence2 h
D012t-rinse2 h
D013t-impulse RO valves20 s
D014t-interval RO valves3 min
D015t-impulse subloop valves60 s

Terminal Assignments (I/O Mapping)

TerminalSignalTypeFunction
X3108-110PR04AI11Pressure return ring line
X3111-113PR05AI12Operating pressure
X3114-116PR06AI13Concentrate pressure
X3117-119PR10AI14Permeate back pressure
X3120-122PR07AI15Supply pressure
X3123-125PR08AI16Operating pressure 2
X3126-128PR09AI17Concentrate pressure 2
X3129-131T05AI18Temperature 5
X3132-134AEAI19Analog input (reserved)
X3135-137AEAI20Analog input (reserved)
X251-53Uni-AAA001DIUniversal digital input
X386-88A002DIDigital input
X389-91P2AIAnalog input
X392-94AOAOAnalog output
X51-53DI30–DI31DIDigital inputs (disabled)

πŸ“Œ Note: X2 = Mainboard, X3 = Expansion board, 0X.. = VBS (Valve Bus System). Some inputs marked "disabled" are not used.

Created by: Lei RO

Date: 01.03.21

Checked / Approved: (signature)

Date: 18.03.21

2K2.1A βœ“ 2K2.1B βœ“

Temp: 21.8 Β°C

Humidity: 8:0.95

This protocol is a translation of the original German document (AF20-008099_0A465916).
All measurements and checkmarks correspond to the original test record.